Travel and Transport
RAIL
Click here for Thameslink – Travel information and timetables
Click here for Thameslink – Live Arrivals and Departures Board
BUS
Click here for Arriva Service 42 (one bus, 4:02am from Radlett Recreation Ground to Borehamwood, Elstree, Bushey, South Oxhey, Rickmansworth, Croxley Green, Watford, Abbots Langley, Garston (5:27am))
Click here for Arriva Service 724 (Harlow (connect with 510 for Stansted Airport), Hertford, WGC, Hatfield, St Albans, Watford, Denham, Uxbridge, Heathrow Airport). PLEASE NOTE: You will need to travel to St Albans City Station in order to catch this bus.
Click here for Uno Service 602 (Hatfield, St Albans, London Colney, Shenley, Borehamwood, Radlett, Aldenham, Bushey, Watford)
Click here for Uno Service 632 (Hatfield, London Colney, Shenley, Radlett, Aldenham, Bushey, Watford)
Click here for Uno Service 655 (Borehamwood, Shenley, Radlett, Park Street, St Albans, Hatfield)
PLUSBUS – Train and Bus
Click here for fares and links to the zone map and bus times.
If you’re travelling by train and need the bus at either end of the journey, ask for PLUSBUS. It’s a simple, easy-to-use bus add-on to your rail ticket and lets you travel on most buses within the local PLUSBUS area as many times as you like. It’s quicker and cheaper than stopping to buy tickets for each leg of your journey. Buy your PLUSBUS ticket in advance from any staffed rail station. No more queues, simply show your ticket on the bus and off you go!
Radlett PLUSBUS tickets are valid for use within an area that includes Aldenham, Batlers Green, Shenley, Porters Park, Bricket Wood, How Wood, Chiswell Green, Park Street and London Colney.
The participating operators and services are:
Arriva (42, W1), Centrebus (320, 359), Metroline (84, 84X), Sullivan Buses (656) and Uno (602, 622, 632, 655, 656)
Click here for the full leaflet on PLUSBUS in Harpenden, St Albans, Radlett and Elstree & Borehamwood.
EERA Draft Plan
RESPONSES TO DRAFT REVISION OF THE REGIONAL SPATIAL STRATEGY[RSS] FOR THE EAST OF ENGLAND
CHAPTER 3 VISION & OBJECTIVES | States: ‘that spatial planning is intended to sustain and improve the quality of life for all people who live in the region’ | RSGBA SUPPORTS CPRE COMMENT: OBSERVATION: In Hertfordshire, the plan involves widespread development on green fields, loss of countryside, urbanisation of country villages together with increased congestion and pollution. This represents substantial reduction in the quality of life for thousands of people. |
CHAPTER 4 POLICY No SS1 CORE SPATIAL STRATEGY | States: ‘ …there will still need to be significant investment in infrastructure because parts of the region already have deficits that need to be rectified’ | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: In Hertfordshire, the level of housing and other development proposed cannot be accommodated without massive government investment in the infrastructure which, so far, has not been be provided. |
CHAPTER 4 POLICY No SS1 URBAN EXPANSION Development in and adjoining urban areas | States: ‘Greenfield land releases should be appropriate in scale to the adjoining urban area.’ | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: Large Greenfield releases within the London Arc north of Harlow and north and west of Stevenage will become London commuter suburbs, increasing congestion. |
CHAPTER 4 POLICY No SS4 Use of Land | States: “At least 60% of all new development in the region will take place in or using previously used land or buildings” | RSGBA SUPPORTS CPRE COMMENT: OBSERVATION: The target for previously used land or buildings should be at least 70%, as has already been achieved in Hertfordshire. |
CHAPTER 4 POLICY No SS7 GREEN BELT | States: ‘…reviews of Green Belt boundaries are needed as part of an appraisal to identify the most sustainable locations for new development..’ | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: There is no justification for house building in the Green Belt north of Harlow, around Stevenage and in other parts of Hertfordshire. It destroys the purpose of the Green Belt and does not meet the criteria for removal of land from it. It will adversely affect the rural of life of those living in and near the threatened locations-. In the context of the London Arc, we are unhappy with the idea of ‘compensating additions’ to the Green Belt because once ‘lost’, it is lost from the location where it was designated as protection against merging of settlements. This defeats the basic aim of the policy – to stop expansion – and the compensating ‘new’ land may not need the protection anyway. |
CHAPTER 4 POLICY No SS8 Land in the Urban Fringe | We wish to see the highest level of protection of land in the urban fringe against housing development in particular; such sites afford peace and space for prayer & contemplation for the adjoining settlements. | |
CHAPTER 4 POLICY No SS9 Development in Rural Areas | We are concerned about the viability of agriculture in the urban fringe; consideration should be given to the amount of land that could be needed by future generations for growing energy crops. | |
CHAPTER 4 POLICY No SS13 Overall Housing Provision | States: ‘In the East of England as a whole, provision will be made for an annual average rate of completion of 23,900 net additional dwellings over the period 2001–2021, a total of 478,000 dwellings…’ | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: The case has not been made for the large figures for additional housing in Hertfordshire, the most crowded county in the country. The scale of building proposed cannot be supported by the infrastructure, will not solve the problems of affordability and key worker housing, but will result in crowding, congestion and reduction in quality of life. |
CHAPTER 4 POLICY No SS16 Quality of the Build Environment | Depending on how ‘net density’ is measured, we do not support 30dph; there are many areas where this would be totally inappropriate and the requirement would be at odds with criterion set out in the first bullet point. | |
CHAPTER 5 POLICY No LA1 Para1, Bullet 1 ‘urban renaissance’ | We fully support the protection of open land between settlements through green belt policy and other policies of restraint. | |
CHAPTER 5 POLICY No LA1 Para 1,Bullet 2 ‘economic prosperity’ | While there are conflicting requirements in the Policy, we support this bullet point. | |
CHAPTER 5 POLICY No LA1 Para 1, Bullet 3 ‘affordable housing’ | We give qualified support to this Policy; we suggest that a fund is created for affordable housing with financial contributions from all development of land. | |
CHAPTER 5 POLICY No LA1 Para 1,Bullet 4 ‘transport management measures’ | We are concerned that ‘transport demand management measures’ to imply restriction to freedom of surface movement hitherto enjoyed by the population in general. We would suggest that the Policy should include: for cyclists and pedestrians the provision of safe routes to employment and shopping and improvement of facilities. The Policy should include the provision of school bus service for all pupils; this would make a positive contribution to transport demand management measures | |
CHAPTER 5 POLICY No LA1 Para 1, Bullet 5 ‘land between settlements’ | SUPPORT | |
CHAPTER 5 POLICY No LA1 Para 2: Substantial new development | States: ‘Sustainable Development: meets the needs of the present without compromising the ability of future generations to meet their own needs. It means meeting four objectives at the same time, in the UK and the world as a whole: o social progress which recognises the needs of everyone o effective protection of the environment o prudent use of natural resources o maintenance of high and stable levels of economic growth and employment’ | We find the use of the widespread use of the word ‘sustainable’ in this document very worrying. There are 244 uses of ‘Sustainable’ and 54 uses of ‘Sustainable Development’ in the RSS. Because ‘sustainability’ cannot be measured and ‘meeting the objectives’ would be subject to a consensus, it would tend to renders the policies open to continual land speculation and argument. This uncertainty would seriously undermine confidence. |
CHAPTER 5 POLICY No LA1 Para 2, Bullet 3 ‘sustainable dev. | SUPPORT | |
CHAPTER 7 POLICY No H1 Dwellings: Hertfordshire Annual Average: 3,980 Total: 79,600 | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: The housing numbers for Hertfordshire are excessive, especially in the predominantly rural districts of East Herts and North Herts. Building on this scale will entail unacceptable loss of Green Belt, added congestion and strain on the infrastructure with the consequent substantial deterioration in quality of life for residents of and visitors to the County. | |
CHAPTER 8 POLICY No T1 Regional transport strategy There are six policy objectives aimed at supporting the vision and objectives of the spatial and economic strategies. | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: The apparent lack of commitment by central government to provide the funds required to remedy even the existing infrastructure deficit, let alone that required for the excessive house building proposed in the plan, makes the policy objectives unattainable. The plan proposes what will undoubtedly become London commuter suburbs to the north of Harlow and the west of Stevenage, feeding traffic on to the already seriously congested road systems in those areas. | |
CHAPTER 8 POLICY No T5 Airports | States: ‘Access to regional airports, particularly by rail and bus/coach, will be managed and enhanced to suppor1 development as it is approved and enable the airports to contribute to national and regional objectives in relation to economic growth, regeneration and sustainable transport.’ | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: ‘The policy makes no mention of the adverse effects of airport expansion on congestion, noise and climate change, all of which would result in lowered quality of life for residents across Hertfordshire. Nor does it consider the adverse economic effects on local food producers of cheap imports of unseasonable food by air or of the net outflow of holiday travellers on local tourism. |
CHAPTER 9 POLICY No Box 9.1 Environmental resources | This table sets out 8 principles including:- ‘protect, for their own sake, all important aspects of the countryside, including individual features, special sites and the wider landscape’ | RSGBA SUPPORTS CPRE COMMENT: SUPPORT: the principles for management of the environment, but REGRET: the departure from those principles in Hertfordshire. |
CHAPTER 9 POLICY No ENV9 [Para 9.39 map 9.4] Water supply | States: ‘The East of England is the driest region in England, and one of the fastest growing. Water resources are limited and there are already supply-demand issues in parts of the Region.’ | RSGBA SUPPORTS CPRE COMMENT: OBSERVATION: The area around Stevenage proposed for major housing development lies in an area with unsuitable or unacceptable abstraction regime’ as shown in Map 9.4 |
CHAPTER 11 POLICY No IMP3 Implementation & Delivery Establishment of local deliverable LDVs: | RSGBA SUPPORTS CPRE COMMENT: OPPOSE: The plan has been produced via the unaccountable, undemocratic system of Regional Government which is unacceptable to the vast majority of people in the region, as shown in opinion polls. The imposition of Iocal quangos to force through unwanted and damaging development compounds this democratic deficit. |
Radlett Society Membership Survey Results
FINAL RANKING
ISSUE / CONCERN |
VOTES
|
%
|
|
1
|
Protecting the Green Belt around Radlett against development |
516
|
19.4
|
2
|
Monitoring and commenting on planning applications |
436
|
16.4
|
3
|
Monitoring the state of roads, verges, and parking |
288
|
10.8
|
4
|
Trying to ensure the regular removal of litter and rubbish (including visible rubbish on private land) |
246
|
9.2
|
5
|
Monitoring Radlett and Letchmore Heath’s Conservation Areas and sites of historical interest |
240
|
9.0
|
6
|
Monitoring the state of the footpaths around Radlett and Aldenham |
232
|
8.7
|
7
|
Representing the views of members in connection with the train service to and from Radlett |
223
|
8.4
|
8
|
Monitoring and trying to safeguard protected trees |
219
|
8.2
|
9
|
Representing the views of members on Radlett’s Crime Prevention Group |
175
|
6.6
|
10
|
Representing the views of members on Elstree Aerodrome’s Consultative Committee |
88
|
3.3
|
100
|